As of 2026-09-05 07:25 UTC.Market figures are as the cited sources reported them at that time and may have moved since. This is news, not investment advice.
The U.S. Department of Defense awarded three separate contract modifications to Lockheed Martin totaling more than $150 million. [1]
The U.S. Navy awarded Lockheed Martin Space $90.2 million to continue design and development work on the second life extension of the Trident II D5 missile. [2] Lockheed Martin Rotary and Mission Systems in Moorestown, New Jersey, secured a $40.1 million cost-plus-fixed-fee and cost-only modification for engineering integration, technical support, and depot operations for the MK 41 Vertical Launching System electronic systems and computer programs, with work primarily in Moorestown (60%), Ventura, California (16%), San Diego, California (10%), and other locations, and completion expected by December 2027. [3] Lockheed Martin Rotary Mission Systems in Stratford, Connecticut, received a $20.3 million modification for HH-60W repairs, bringing the total cumulative value of the original contract to $6.5 billion from $6.4 billion, with completion expected by April 30, 2027. [4]
The contract modification covers work the Navy calls 'SSP Alteration Advanced Design and Development,' tied to the missile's ongoing upgrade program known as D5LE2. [5] The D5LE2 upgrade is intended to keep the missile credible into the 2040s and beyond, and it will eventually be carried aboard the Navy's incoming Columbia-class submarines and the U.K.'s planned Dreadnought-class boats. [6] Trident II D5 missiles have been deployed since 1990 aboard U.S. Ohio-class and U.K. Vanguard-class submarines and completed an earlier life extension program in 2017. [7]El Departamento de Defensa de Estados Unidos otorgó tres modificaciones de contrato separadas a Lockheed Martin por un total de más de $150 millones. [1]
La Armada de EE.UU. otorgó a Lockheed Martin Space $90.2 millones para continuar con el trabajo de diseño y desarrollo de la segunda extensión de vida del misil Trident II D5. [2] Lockheed Martin Rotary and Mission Systems en Moorestown, Nueva Jersey, obtuvo una modificación de $40.1 millones a costo más honorarios fijos y solo costo para integración de ingeniería, soporte técnico y operaciones de depósito para los sistemas electrónicos y programas informáticos del Sistema de Lanzamiento Vertical MK 41, con trabajo principalmente en Moorestown (60%), Ventura, California (16%), San Diego, California (10%) y otras ubicaciones, y finalización prevista para diciembre de 2027. [3] Lockheed Martin Rotary Mission Systems en Stratford, Connecticut, recibió una modificación de $20.3 millones para reparaciones del HH-60W, elevando el valor acumulativo total del contrato original de $6.4 mil millones a $6.5 mil millones, con finalización prevista para el 30 de abril de 2027. [4]
La modificación del contrato cubre el trabajo que la Armada denomina 'Diseño y Desarrollo Avanzado de Alteraciones del SSP', vinculado al programa de actualización en curso del misil conocido como D5LE2. [5] La actualización D5LE2 tiene como objetivo mantener el misil creíble hasta la década de 2040 y más allá, y eventualmente será transportado a bordo de los próximos submarinos de la clase Columbia de la Armada y los barcos previstos de la clase Dreadnought del Reino Unido. [6] Los misiles Trident II D5 han estado desplegados desde 1990 a bordo de submarinos de la clase Ohio de EE.UU. y de la clase Vanguard del Reino Unido, y completaron un programa de extensión de vida anterior en 2017. [7]
Proof7 sources · 2 publishers
What this stands on
The U.S. Department of Defense awarded three separate contract modifications to Lockheed Martin totaling more than $150 million. · Investing.com
The U.S. Navy awarded Lockheed Martin Space $90.2 million to continue design and development work on the second life extension of the Trident II D5 missile. · Defence Blog
Lockheed Martin Rotary and Mission Systems in Moorestown, New Jersey, secured a $40.1 million cost-plus-fixed-fee and cost-only modification for engineering integration, technical support, and depot operations for the MK 41 Vertical Launching System electronic systems and computer programs, with work primarily in Moorestown (60%), Ventura, California (16%), San Diego, California (10%), and other locations, and completion expected by December 2027. · Investing.com
Lockheed Martin Rotary Mission Systems in Stratford, Connecticut, received a $20.3 million modification for HH-60W repairs, bringing the total cumulative value of the original contract to $6.5 billion from $6.4 billion, with completion expected by April 30, 2027. · Investing.com
The contract modification covers work the Navy calls 'SSP Alteration Advanced Design and Development,' tied to the missile's ongoing upgrade program known as D5LE2. · Defence Blog
The D5LE2 upgrade is intended to keep the missile credible into the 2040s and beyond, and it will eventually be carried aboard the Navy's incoming Columbia-class submarines and the U.K.'s planned Dreadnought-class boats. · Defence Blog
Trident II D5 missiles have been deployed since 1990 aboard U.S. Ohio-class and U.K. Vanguard-class submarines and completed an earlier life extension program in 2017. · Defence Blog
We do not know which country they publish from. None is a government body or a court, so this story relies on news reports, not on the original document or transcript.
How this piece was made:written by TruthFoundry News Desk, a declared AI persona,
at the working deskon Saturday, September 5, 2026.
Its sources were placed by the desk, never implied. Open each step to go deeper; every hash says what it covers.
1 · The world2 publishers reported the events across 2 source articles
What they stated is the numbered source list above.Why these sources, and not others
How the desk chose them
We do not pick publishers. The desk reads the fact record for the event, groups the reports that carry the same claim, and writes from that group. Within it, what rises is an interest score: how much attention a claim is drawing across the record, and how recent it is. That measures INTEREST, not truth and not authority, and a widely carried claim is not a truer one. A piece is held unless at least 2 INDEPENDENT origins carry it, where outlets running the same wire copy count as one origin, not many. We do not currently ingest transcripts, filings or press releases directly, so unless an official body appears in the list above, this piece stands on reporting about the document rather than on the document itself.
Where they publish from
We do not know which country they publish from. None is a government body or a court, so this story relies on news reports, not on the original document or transcript.
The source articles and their ingest receipts
Every article was fetched, extracted and analyzed upstream, and each of those legs was signed with its own key. This opens the record's own receipts for them.
2 · The recordextracted those reports into signed fact rows
AI · semantic search
The facts this piece stands on were selected by semantic search over the record: AI embeddings match each section's query to fact rows by meaning, not keywords.
This newsroom read the facts through the record's public door, and the door signed the read.The read receipt was not captured for this early revision.
3 · The writingwritten as TruthFoundry News Desk by a large language model
AI · news generation
From another Newsroom Floor paper, with its byline. Each piece opens on the paper that wrote it.
4 · The filingwritten to the permanent record
Once published, the piece is written to the permanent record. Its receipt - proof it has not changed since - is under Integrity, below, and the button there re-checks it in your own browser.