{
  "story_id": "1cf2a48250e372bc086d8aa0603d3de5",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-26T17:46:48.000Z",
  "content_hash": "3d533556f4840bc357f0a76d1045e273e059c57c25e5b70deb127857ddd82508",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Major electrical grid failure impacts four southern Colombian departments",
    "dek": "Large power outage affects Huila, Nariño, Caquetá, Putumayo in southern Colombia",
    "prose": "On 2026-11-24 at approximately 18:20 local time, a major failure occurred in Colombia's national interconnected electrical system affecting Nariño, Caquetá, Putumayo and southern Huila. [^1]\n\nOn November 24, 2026, an attack on the electrical system left five departments in Colombia without power. [^2] The guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force. [^3] ElectroCaquetá stated it is providing partial power supply via the legacy 115 kV Betania-Altamira-Florencia transmission corridor, with 10 megawatts of available capacity. [^4]\n\nPower supply priority is being allocated to hospitals, clinics, health centres and communications systems during the outage. [^5] Energy sector guilds in Colombia issued a joint statement condemning attacks on the country's energy infrastructure and expressing solidarity with affected communities. [^6] The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens. [^7]",
    "cited": "[{\"statement\":\"On 2026-11-24 at approximately 18:20 local time, a major failure occurred in Colombia's national interconnected electrical system affecting Nariño, Caquetá, Putumayo and southern Huila.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-25T01:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/\"},{\"statement\":\"On November 24, 2026, an attack on the electrical system left five departments in Colombia without power.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"The guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"ElectroCaquetá stated it is providing partial power supply via the legacy 115 kV Betania-Altamira-Florencia transmission corridor, with 10 megawatts of available capacity.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-25T01:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/\"},{\"statement\":\"Power supply priority is being allocated to hospitals, clinics, health centres and communications systems during the outage.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-25T01:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/\"},{\"statement\":\"Energy sector guilds in Colombia issued a joint statement condemning attacks on the country's energy infrastructure and expressing solidarity with affected communities.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "9f126232888b5379fe9ed25bd6e8951948cd07401c16efeaf347cd64dcdcc5ed",
    "cursor_from": "ingest:raw_newsroomfloor.stories:9f126232888b5379",
    "cursor_to": "ingest:raw_newsroomfloor.stories:9f126232888b5379",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "Lt7TKrqazsUpsyWeULaJSyX3slEgTjCiQdY5C3b4G3IKNPM4566WoR__Zb607IK2zb9xnipX8Aq4D_Ef_XNmCQ",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "7709477c6dd3bdbbd4cdd57b5d627ffe",
      "thread_id": "662d0b6038a46e2a39fe007aea7dbf13",
      "thread_label": "Electrocaquetá",
      "novelty": "UPDATE",
      "content_hash": "fbf3616df73d5511ef4bb8188a84f5c6a3fca76135531463ba4c8758cdd101d3",
      "compose": 3,
      "last_published_at": "2026-11-26T17:46:48.000Z",
      "read_receipt": {
        "slice_hash": "323ecf848430eb4c96f9823d6b1a4e1af516f412ae7561ee325639c6e6a56012",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjZUMTc6MTI6NDEuMDAwWiIsImlkIjoiYWQ2ZThmZTczNWMxMWI2YzFjM2UzMDE2N2ZlOWMxNDIiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjZUMTc6NDc6MzAuMDAwMDAwWiIsImlkIjoiNTI4MGNhM2IxZDI3YTIxM2JhM2UyZDBmMjMzMTg5NzkiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 38,
        "window_days": 3,
        "bytes_scanned": 5318025,
        "credits": 3.04,
        "price_per_100_rows": 8,
        "sig": "zAp8krNB6RnQy8R9orzP1z7ie19nUEz-_Vow7D1N96aqowlFmdkxa470tXVGS0mI6q5qRqh8tlc3ae9aYyA_Bg",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-26T18:57:17.013Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "On 2026-11-24 at approximately 18:20 local time, a major failure occurred in Colombia's national interconnected electrical system affecting Nariño, Caquetá, Putumayo and southern Huila.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "On November 24, 2026, an attack on the electrical system left five departments in Colombia without power.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "The guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "ElectroCaquetá stated it is providing partial power supply via the legacy 115 kV Betania-Altamira-Florencia transmission corridor, with 10 megawatts of available capacity.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "Power supply priority is being allocated to hospitals, clinics, health centres and communications systems during the outage.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/25/falla-de-gran-magnitud-en-el-sistema-electrico-afecta-al-sur-del-huila-y-otros-tres-departamentos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "Energy sector guilds in Colombia issued a joint statement condemning attacks on the country's energy infrastructure and expressing solidarity with affected communities.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}