{
  "story_id": "367c2de3c4306a7193fd8774e6ea32af",
  "desk": "drm3",
  "revision": 2,
  "published_at": "2026-09-03T16:15:00.000Z",
  "content_hash": "585da24c0aa8ef4bace12fdf572c98e6ce155478e05d4562f59ccf79cc7d1c83",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Bogotá Mayor Galán Warns of Possible Power Blackout During El Niño Peak",
    "dek": "Bogotá Mayor Carlos Fernando Galán warned of a possible power blackout during El Niño's November-to-February peak.",
    "prose": "Bogotá Mayor Carlos Fernando Galán said in an interview with CityTV that there is a risk of a power blackout in Bogotá during the most intense phase of the El Niño phenomenon, which he said will be felt from November through February of the following year. [^1]\n\nCarlos Fernando Galán, the mayor of Bogotá, warned that the city could face power outages due to insufficient energy networks if consumption increases without infrastructure improvements. [^2] Bogotá Mayor Carlos Fernando Galán said the risk is latent because the central region where Bogotá is located does not currently have the capacity to supply the electricity demand being generated. [^3][^4] The mayor emphasized the need to complete pending energy transmission networks in Bogotá and develop new political projects focused on energy. [^5]\n\nBogotá's water utility, El Acueducto, has stated that the provision of water service in the city is not threatened by El Niño. [^6] Galán indicated that the El Niño climate phenomenon may influence the city's energy matters, although the water utility has ruled out water rationing in Bogotá. [^7]",
    "cited": "[{\"statement\":\"Bogotá Mayor Carlos Fernando Galán said in an interview with CityTV that there is a risk of a power blackout in Bogotá during the most intense phase of the El Niño phenomenon, which he said will be felt from November through February of the following year.\",\"source\":\"Valora Analitik\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T16:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Valora Analitik\"]},{\"statement\":\"Carlos Fernando Galán, the mayor of Bogotá, warned that the city could face power outages due to insufficient energy networks if consumption increases without infrastructure improvements.\",\"source\":\"ELHERALDO.CO\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T15:30:25.000Z\",\"publisher_count\":1,\"sources\":[\"ELHERALDO.CO\"]},{\"statement\":\"Bogotá Mayor Carlos Fernando Galán said Bogotá does not face water supply challenges during the El Niño phenomenon, but does face energy challenges for both the country and the central region.\",\"source\":\"Valora Analitik\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T16:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Valora Analitik\"]},{\"statement\":\"Bogotá Mayor Carlos Fernando Galán said the risk is latent because the central region where Bogotá is located does not currently have the capacity to supply the electricity demand being generated.\",\"source\":\"Valora Analitik\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T16:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Valora Analitik\"]},{\"statement\":\"The mayor emphasized the need to complete pending energy transmission networks in Bogotá and develop new political projects focused on energy.\",\"source\":\"ELHERALDO.CO\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T15:30:25.000Z\",\"publisher_count\":1,\"sources\":[\"ELHERALDO.CO\"]},{\"statement\":\"Bogotá's water utility, El Acueducto, has stated that the provision of water service in the city is not threatened by El Niño.\",\"source\":\"Valora Analitik\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T16:15:00.000Z\",\"publisher_count\":1,\"sources\":[\"Valora Analitik\"]},{\"statement\":\"Galán indicated that the El Niño climate phenomenon may influence the city's energy matters, although the water utility has ruled out water rationing in Bogotá.\",\"source\":\"ELHERALDO.CO\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-09-03T15:30:25.000Z\",\"publisher_count\":1,\"sources\":[\"ELHERALDO.CO\"]}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": null,
  "receipt_note": "this revision predates receipt-keeping (before v0.37.0); the filed row lives in the record",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "9a6775b0d974cfa5539d8ce8b0336f8d",
      "thread_id": "4f310c50c26c5079784162fbfc09d956",
      "thread_label": "Energía Bogotá",
      "novelty": "UPDATE",
      "content_hash": "3ec513082b7f436c68a2b27b4f4ade9939aec6466ed6f8f2bbf47aff2dd75d9a",
      "last_published_at": "2026-09-03T16:15:00.000Z",
      "read_receipt": {
        "slice_hash": "f00ea4487a35f7d6cb0b2ecba64018b42f5528b23cf0458226e121b2c25753aa",
        "cursor_from": "eyJ0cyI6IjIwMjYtMDktMDNUMTU6NTg6NDQuMDAwMDAwWiIsImlkIjoiN2JjZTlmODJkMDczOWNkYTMzY2VhYjE5ZGNkOGU5OWYiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMDktMDNUMTY6MjI6MjQuMDAwMDAwWiIsImlkIjoiYjQ3NTBjZTc2M2YxODkwMDk4OGYyMWZhYWEzYWUxNjkiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 12166856,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "jDh8FniK9MnI4xz1KpeRtnCOCLXOU1SpzEza60xUk_ARXnTeHK9vLPcFsK07K5ZMhoOm6uykIvDilYrWTP-TBQ",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "compose": 3,
      "recomposed_at": "2026-09-05T20:35:43.353Z"
    },
    "written_at": "2026-09-04T06:32:38.752Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "Bogotá Mayor Carlos Fernando Galán said in an interview with CityTV that there is a risk of a power blackout in Bogotá during the most intense phase of the El Niño phenomenon, which he said will be felt from November through February of the following year.",
      "source": "Valora Analitik",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "Carlos Fernando Galán, the mayor of Bogotá, warned that the city could face power outages due to insufficient energy networks if consumption increases without infrastructure improvements.",
      "source": "ELHERALDO.CO",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "Bogotá Mayor Carlos Fernando Galán said Bogotá does not face water supply challenges during the El Niño phenomenon, but does face energy challenges for both the country and the central region.",
      "source": "Valora Analitik",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "Bogotá Mayor Carlos Fernando Galán said the risk is latent because the central region where Bogotá is located does not currently have the capacity to supply the electricity demand being generated.",
      "source": "Valora Analitik",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "The mayor emphasized the need to complete pending energy transmission networks in Bogotá and develop new political projects focused on energy.",
      "source": "ELHERALDO.CO",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "Bogotá's water utility, El Acueducto, has stated that the provision of water service in the city is not threatened by El Niño.",
      "source": "Valora Analitik",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "Galán indicated that the El Niño climate phenomenon may influence the city's energy matters, although the water utility has ruled out water rationing in Bogotá.",
      "source": "ELHERALDO.CO",
      "instrument": "News",
      "claim_key": null,
      "url": null,
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}