{
  "story_id": "47edfdbaa8b7c988e11a4f67f49e2cff",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-27T10:42:58.000Z",
  "content_hash": "e093b65e25ec58f863db064184c891890353bc5e1fdbe0aaf289f83bd44cdbec",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Energy sector guilds urge Colombian government to secure power infrastructure",
    "dek": "Energy sector guilds call for government action to protect power infrastructure after recent attacks",
    "prose": "On November 24, 2026, an attack on the electrical system left five departments in Colombia without power. [^1]\n\nThe guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force. [^2] Colombian energy industry associations released a statement on 26 November 2026 requesting national and territorial authorities to urgently reinforce security for energy infrastructure and personnel [^3] The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens. [^4]\n\nAn attack occurred against the Amaime hydroelectric plant in Palmira, Valle del Cauca, and an attempted attack on a propane pipeline in Caparrapí, Cundinamarca was stopped by the Colombian National Army [^5] An attack on 15 November 2026 against transmission infrastructure in El Pital, Huila reduced energy transport capacity to Caquetá and caused widespread power outages for all Electrocaquetá users [^6] Industry groups stated that attacks on energy infrastructure cause service interruptions impacting households, commercial activity and essential public services [^7]",
    "cited": "[{\"statement\":\"On November 24, 2026, an attack on the electrical system left five departments in Colombia without power.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"The guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"Colombian energy industry associations released a statement on 26 November 2026 requesting national and territorial authorities to urgently reinforce security for energy infrastructure and personnel\",\"source\":\"Pulzo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T10:42:58.000Z\",\"publisher_count\":1,\"sources\":[\"Pulzo\"],\"url\":\"https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A\"},{\"statement\":\"The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-26T17:46:48.000Z\",\"publisher_count\":1,\"sources\":[\"El Espectador\"],\"url\":\"https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/\"},{\"statement\":\"An attack occurred against the Amaime hydroelectric plant in Palmira, Valle del Cauca, and an attempted attack on a propane pipeline in Caparrapí, Cundinamarca was stopped by the Colombian National Army\",\"source\":\"Pulzo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T10:42:58.000Z\",\"publisher_count\":1,\"sources\":[\"Pulzo\"],\"url\":\"https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A\"},{\"statement\":\"An attack on 15 November 2026 against transmission infrastructure in El Pital, Huila reduced energy transport capacity to Caquetá and caused widespread power outages for all Electrocaquetá users\",\"source\":\"Pulzo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T10:42:58.000Z\",\"publisher_count\":1,\"sources\":[\"Pulzo\"],\"url\":\"https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A\"},{\"statement\":\"Industry groups stated that attacks on energy infrastructure cause service interruptions impacting households, commercial activity and essential public services\",\"source\":\"Pulzo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T10:42:58.000Z\",\"publisher_count\":1,\"sources\":[\"Pulzo\"],\"url\":\"https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "6178b41e400886f74d4dc772dca667e0fc3b56f836b87c9e8677b6b0f1650bb4",
    "cursor_from": "ingest:raw_newsroomfloor.stories:6178b41e400886f7",
    "cursor_to": "ingest:raw_newsroomfloor.stories:6178b41e400886f7",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "NL6w2T5saviaQG0iqQYkutdusMUsYkaO_iEIcjtEdSuPRvso9FB202v2YgVt9Jbp0F_AbXqsCrRMXuNQJWXmBg",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "db48710c534671fce97efb9eb6c3bc1b",
      "thread_id": "3d32d63aab111406f523fa082ab7f26a",
      "thread_label": "Amaime hydroelectric plant",
      "novelty": "UPDATE",
      "content_hash": "667dea620761416f620e965532b3ac86422442c5aa237c36b167d1501a6c3bd3",
      "compose": 3,
      "last_published_at": "2026-11-27T10:42:58.000Z",
      "read_receipt": {
        "slice_hash": "944578017919ddd8a6784aae98329974134600f8c8e9d505764c2bf2bec97f06",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjdUMDk6NTk6NDkuMDAwWiIsImlkIjoiY2NkZjBhZTE3ZTQ3NjUxNGZjYjUyZjY4NTcwZTA0MGQiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjdUMTI6MTA6MjIuMDAwMDAwWiIsImlkIjoiNDQ1YzRhNDkzMGIxNTRkZjdlY2Q1Mzk3MDk0ZTdiZmIiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 91,
        "window_days": 3,
        "bytes_scanned": 5634468,
        "credits": 7.28,
        "price_per_100_rows": 8,
        "sig": "OeZN54aXtrzTRzXUGl-lZHj5gQb_8x0-fsFw0SdLhIE53FwRTjqDdiFmofY0SjIU9BNKQXGwtfshGGKfWCgMDg",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-27T12:28:23.801Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "On November 24, 2026, an attack on the electrical system left five departments in Colombia without power.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "The guilds call on the national government and local authorities to strengthen protection measures for electrical and gas infrastructure in coordination with the public force.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "Colombian energy industry associations released a statement on 26 November 2026 requesting national and territorial authorities to urgently reinforce security for energy infrastructure and personnel",
      "source": "Pulzo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "The guilds express their willingness to work with authorities, XM, and sector companies to prevent new affects, facilitate the safe restoration of the service, and protect the continuity of the supply for citizens.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/economia/empresas/gremios-energeticos-le-piden-al-gobierno-garantizar-la-continuidad-del-servicio-de-energia/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "An attack occurred against the Amaime hydroelectric plant in Palmira, Valle del Cauca, and an attempted attack on a propane pipeline in Caparrapí, Cundinamarca was stopped by the Colombian National Army",
      "source": "Pulzo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "An attack on 15 November 2026 against transmission infrastructure in El Pital, Huila reduced energy transport capacity to Caquetá and caused widespread power outages for all Electrocaquetá users",
      "source": "Pulzo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "Industry groups stated that attacks on energy infrastructure cause service interruptions impacting households, commercial activity and essential public services",
      "source": "Pulzo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.pulzo.com/economia/atentados-a-infraestructura-energetica-en-colombia-riesgos-impacto-y-medidas-urgentes-PP5365347A",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}