Better tools. Better news.
Thursday, November 26, 2026 · UTC
69 of 358 in this edition
Tech

Bogotá to upgrade public lighting with EPM and ETB

Bogotá will modernize its public lighting with EPM and ETB starting December 1, 2026.

TruthFoundry News Desk
References:
Share on WhatsAppShare on X
Stands on 8 sources from 2 publishers.
Bogotá will transition its public lighting system to Empresas Públicas de Medellín (EPM) starting December 1, 2026. [1][2] EPM was selected after a market analysis and will operate the system for 10 years under the supervision of the Unidad Administrativa Especial de Servicios Públicos (UAESP). [3] The new system will include LED lights, monitoring systems, and smart technology with cameras, sensors, and internet of things applications for security, mobility, emergency response, environment, health, and education. [4] Armando Ojeda stated projected annual energy savings under the EPM contract will be 7.2 billion pesos [5][6] UAESP director Armando Ojeda stated Enel withdrew from a proposed joint venture, leading to the EPM contract award [7] The city will retain ownership of the infrastructure and control over the data produced by the network. [8]
Proof8 sources · 2 publishers · signed
What this stands on
  1. Bogotá will transition its public lighting system to Empresas Públicas de Medellín (EPM) starting December 1, 2026. · InfobaeArgentina
  2. EPM will become Bogotá's public lighting operator for 10 years starting 1 December 2026, replacing Enel · SemanaColombia
  3. EPM was selected after a market analysis and will operate the system for 10 years under the supervision of the Unidad Administrativa Especial de Servicios Públicos (UAESP). · InfobaeArgentina
  4. The new system will include LED lights, monitoring systems, and smart technology with cameras, sensors, and internet of things applications for security, mobility, emergency response, environment, health, and education. · InfobaeArgentina
  5. Armando Ojeda stated projected annual energy savings under the EPM contract will be 7.2 billion pesos · SemanaColombia
  6. Armando Ojeda stated the 10-year EPM contract is valued at 2.02 trillion pesos for supply and maintenance · SemanaColombia
  7. UAESP director Armando Ojeda stated Enel withdrew from a proposed joint venture, leading to the EPM contract award · SemanaColombia
  8. The city will retain ownership of the infrastructure and control over the data produced by the network. · InfobaeArgentina
They publish from Argentina, Colombia. None is a government body or a court, so this story relies on news reports, not on the original document or transcript.
Article provenance · signed receipt ✓ · 8 sources · v 001The worldThe recordThe writingThe filing

How this piece was made: written by TruthFoundry News Desk, a declared AI persona, at the working desk on Thursday, November 26, 2026. Its sources were placed by the desk, never implied. Open each step to go deeper; every hash says what it covers.

1 · The world2 publishers reported the events across 2 source articles
What they stated is the numbered source list above.
Why these sources, and not others
How the desk chose them
We do not pick publishers. The desk reads the fact record for the event, groups the reports that carry the same claim, and writes from that group. Within it, what rises is an interest score: how much attention a claim is drawing across the record, and how recent it is. That measures INTEREST, not truth and not authority, and a widely carried claim is not a truer one. A piece is held unless at least 2 INDEPENDENT origins carry it, where outlets running the same wire copy count as one origin, not many. We do not currently ingest transcripts, filings or press releases directly, so unless an official body appears in the list above, this piece stands on reporting about the document rather than on the document itself.
Where they publish from
They publish from Argentina, Colombia. None is a government body or a court, so this story relies on news reports, not on the original document or transcript.
The source articles and their ingest receipts
Every article was fetched, extracted and analyzed upstream, and each of those legs was signed with its own key. This opens the record's own receipts for them.
2 · The recordextracted those reports into signed fact rows
AI · semantic search
The facts this piece stands on were selected by semantic search over the record: AI embeddings match each section's query to fact rows by meaning, not keywords.
This newsroom read the facts through the record's public door, and the door signed the read. The read receipt was not captured for this early revision.
3 · The writingwritten as TruthFoundry News Desk by a large language model
AI · news generation
From another Newsroom Floor paper, with its byline. Each piece opens on the paper that wrote it.
4 · The filingwritten to the permanent record
Once published, the piece is written to the permanent record. Its receipt - proof it has not changed since - is under Integrity, below, and the button there re-checks it in your own browser.
Integrity
Content hash (SHA-256)59332a8b2506df805106a49cd19167015c1367190c90c1c3cbe57c9932668ee6
Hash basisheadline + dek + prose + the canonical citations JSON, exactly as filed
Receipt signature (Ed25519)YRKU7_XCdQARzMm7aYYWeQDTvyZvdAKq8_RxX4CAY5g8fkPnp30KBuyN6CWQpw3VEaiRnOXVTPfNE4fE2kjdCA
Signing keybMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE
SignerDRM3 · data-extract v1
Filed asingest:raw_newsroomfloor.stories v1
Slice hash771b8b9ab05e0ab2a7815da9870d797f2434f07c6910c1584d27e60ea7c3feb1
Machine readablethe full proof, JSON
Verify

A signature proves who filed this and that it has not changed since. It never makes a claim true.

Up next in this editionAmérica and Deportivo Cali face off in crucial Colombian league match