{
  "story_id": "82e41f6efd701b2c8fe699b1d6416191",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-18T13:30:20.000Z",
  "content_hash": "6b4652a6d7f9c57badcc6130bd3317aa513bd5a0e148a8b314f6343d3d580809",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Colegio de Ternera completes infrastructure upgrades, plans further works",
    "dek": "Cartagena public school finishes water/electricity fixes, schedules sports court and wall repairs.",
    "prose": "Institución Educativa de Ternera completed first phase infrastructure upgrades including electrical circuit replacement, elevated water tank installation and roof waterproofing. [^1]\n\nA second phase of works will construct a covered multi-sports court and repair the damaged perimeter wall at the school in coming months. [^2] Acting principal Belsybeth Murillo Maquilón stated prior electrical systems caused frequent outages and fire risks from overloaded air conditioning units. [^3] This school upgrade is part of a Cartagena district program rehabilitating 35 public schools serving approximately 25000 students in 2026. [^4][^5]",
    "cited": "[{\"statement\":\"Institución Educativa de Ternera completed first phase infrastructure upgrades including electrical circuit replacement, elevated water tank installation and roof waterproofing.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T12:44:23.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/\"},{\"statement\":\"A second phase of works will construct a covered multi-sports court and repair the damaged perimeter wall at the school in coming months.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T13:30:20.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/18/nuevas-obras-en-ie-de-ternera-habra-intervencion-de-la-cancha-y-muro-de-cerramiento/\"},{\"statement\":\"Acting principal Belsybeth Murillo Maquilón stated prior electrical systems caused frequent outages and fire risks from overloaded air conditioning units.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T12:44:23.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/\"},{\"statement\":\"This school project is part of the Cartagena municipal 2026 program to upgrade 35 public educational institutions.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T12:44:23.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/\"},{\"statement\":\"This school upgrade is part of a Cartagena district program rehabilitating 35 public schools serving approximately 25000 students in 2026.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T13:30:20.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/18/nuevas-obras-en-ie-de-ternera-habra-intervencion-de-la-cancha-y-muro-de-cerramiento/\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "147e3c87eedf774d33c962f44bdd1864a9a6c00dd88c31a032ee0f599ed68874",
    "cursor_from": "ingest:raw_newsroomfloor.stories:147e3c87eedf774d",
    "cursor_to": "ingest:raw_newsroomfloor.stories:147e3c87eedf774d",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "4FfzSfgE4movkVjZpwOrVnxr9YcHkun5dHM3dP2F0EUlET2X9Gw4mY09u1Ti4iwiSLEq-P-aAX4SDLIzOfQ9Bw",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "11ac2a7f038c56b01ab7110e2f279e6b",
      "thread_id": "68b8d474515a74628430d9d6bae00599",
      "thread_label": "Belsybeth Murillo Maquilón",
      "novelty": "UPDATE",
      "content_hash": "62b3a609e0fdd46eb9970ba616bef16c2ee5fb26c6f7eda82bf325116a47c854",
      "compose": 3,
      "last_published_at": "2026-11-18T13:30:20.000Z",
      "read_receipt": {
        "slice_hash": "36cc1ec92e8c713e810ff42a38a12e81af19eb97039005626f491f12d6c32d42",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMThUMTI6MzA6NTQuMDAwWiIsImlkIjoiZmZmZGZjZGVmOTRlMTk4MDllNDRhY2Y1MmVjNTA3NjkiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMThUMTQ6NTA6NDMuMDAwMDAwWiIsImlkIjoiZGJlMDI2Y2Q2MzE0MzI4NWI4NWM4ZDMwMDU4MmFhOGIiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 3577351,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "W4Va6X6re7hXIwDHFwUOUUQpuvfEy5pLUu90KFQwA_WbBkBEQSHHtsmPnc7VnCZMWmErpD7QBVfRqkQTnEIHAA",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-19T21:18:00.511Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "Institución Educativa de Ternera completed first phase infrastructure upgrades including electrical circuit replacement, elevated water tank installation and roof waterproofing.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "A second phase of works will construct a covered multi-sports court and repair the damaged perimeter wall at the school in coming months.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/18/nuevas-obras-en-ie-de-ternera-habra-intervencion-de-la-cancha-y-muro-de-cerramiento/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "Acting principal Belsybeth Murillo Maquilón stated prior electrical systems caused frequent outages and fire risks from overloaded air conditioning units.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "This school project is part of the Cartagena municipal 2026 program to upgrade 35 public educational institutions.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/18/colegio-de-ternera-mejora-sus-servicios-de-agua-y-energia-y-tendra-mas-obras/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "This school upgrade is part of a Cartagena district program rehabilitating 35 public schools serving approximately 25000 students in 2026.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/18/nuevas-obras-en-ie-de-ternera-habra-intervencion-de-la-cancha-y-muro-de-cerramiento/",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}