{
  "story_id": "a3055d8cb2b5ec8ac059557e4ee7f852",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-27T13:10:05.000Z",
  "content_hash": "06ae776dddd15a1847d6e4f7decff588b12bece6700291f8408d4d656984cbf1",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Colombia's Caquetá faces 20-hour daily blackouts after power infrastructure attacks",
    "dek": "Caquetá department suffers severe energy rationing following attacks on electrical grid infrastructure.",
    "prose": "Caquetá is currently receiving less than 40% of its normal electrical power supply, according to Governor Luis Francisco Ruiz. [^1]\n\nOn 26 November 2026, Caquetá Governor Luis Francisco Ruiz stated that the department is experiencing an energy emergency with up to 20 hours daily without electricity across its 16 municipalities. [^2][^3] On 27 November 2026, southern Colombia suffered attacks on electrical infrastructure causing widespread power outages. [^4] Regional governors stated full repairs to the damaged electrical system will take several days. [^5]\n\nLuis Francisco Ruiz confirmed power was restored to all 16 municipalities of Caquetá on 26 November 2026 following three days of blackouts. [^6] Governor Ruiz attributed the attacks to armed groups, specifically the FARC dissidents, who are pressuring the government to halt military operations against them. [^7][^8] Repairs to damaged power transmission towers in Huila are expected to take between 4 and 6 additional days to complete. [^9]\n\nCaquetá receives less than 40% of the energy it needs, leading to prolonged power outages of up to 20 hours daily in some municipalities. [^10] The attacks on the electrical infrastructure have caused significant economic losses, particularly in the agricultural and commercial sectors. [^11] Partial, gradual restoration of electrical service had begun at the time of reporting. [^12]",
    "cited": "[{\"statement\":\"Caquetá is currently receiving less than 40% of its normal electrical power supply, according to Governor Luis Francisco Ruiz.\",\"source\":\"Blu Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30\"},{\"statement\":\"On 26 November 2026, Caquetá Governor Luis Francisco Ruiz stated that the department is experiencing an energy emergency with up to 20 hours daily without electricity across its 16 municipalities.\",\"source\":\"Blu Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30\"},{\"statement\":\"Governor Luis Francisco Ruiz confirmed on 2026-11-26 that Caquetá is experiencing severe energy shortages due to attacks on its electrical infrastructure.\",\"source\":\"KienyKe\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados\"},{\"statement\":\"On 27 November 2026, southern Colombia suffered attacks on electrical infrastructure causing widespread power outages.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/\"},{\"statement\":\"Regional governors stated full repairs to the damaged electrical system will take several days.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/\"},{\"statement\":\"Luis Francisco Ruiz confirmed power was restored to all 16 municipalities of Caquetá on 26 November 2026 following three days of blackouts.\",\"source\":\"La FM\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.lafm.com.co/orden-publico/caqueta-sufre-tres-dias-de-apagon-gobernador-advierte-otro-ataque-dejarlo-sin-electricidad-418469\"},{\"statement\":\"Governor Luis Francisco Ruiz attributed the power infrastructure attacks to FARC dissident armed groups operating in the region.\",\"source\":\"Blu Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30\"},{\"statement\":\"Governor Ruiz attributed the attacks to armed groups, specifically the FARC dissidents, who are pressuring the government to halt military operations against them.\",\"source\":\"KienyKe\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados\"},{\"statement\":\"Repairs to damaged power transmission towers in Huila are expected to take between 4 and 6 additional days to complete.\",\"source\":\"Blu Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30\"},{\"statement\":\"Caquetá receives less than 40% of the energy it needs, leading to prolonged power outages of up to 20 hours daily in some municipalities.\",\"source\":\"KienyKe\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados\"},{\"statement\":\"The attacks on the electrical infrastructure have caused significant economic losses, particularly in the agricultural and commercial sectors.\",\"source\":\"KienyKe\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados\"},{\"statement\":\"Partial, gradual restoration of electrical service had begun at the time of reporting.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "e84ea989130cd72393050b8f5cdaded6b0f984333f2c7afbf0492a88f5059a95",
    "cursor_from": "ingest:raw_newsroomfloor.stories:e84ea989130cd723",
    "cursor_to": "ingest:raw_newsroomfloor.stories:e84ea989130cd723",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "_A-hOQChfGPVqIY5ZsdqUEQib6y_QRoOWIcXimpT6gFKt9X3oQqJaZ0gQEeYb76544SFaFK7Isxdn1SfsWb_Cw",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "4b87ade9084648f65f55477df1a60856",
      "thread_id": "bd2808c7db67ff683f47cf2b678e7ccf",
      "thread_label": "Luis Francisco Ruiz",
      "novelty": "UPDATE",
      "content_hash": "c557223653b239667a069187a8e4198c2771a16d33bc689810934e30f4f6d587",
      "compose": 3,
      "last_published_at": "2026-11-27T13:10:05.000Z",
      "read_receipt": {
        "slice_hash": "737f0e3d2c91ddc82d9efdee6bfb607b6ce79f52e8986f797833d53d0122cf58",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjdUMTI6NTQ6MDcuMDAwWiIsImlkIjoiM2ZhMzE1MWQwZjFhNjIxYWM2MjNmYmNiN2UzNzk3ODQiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjdUMTQ6MzA6NTAuMDAwMDAwWiIsImlkIjoiM2RhZWRhMjEzODAzODBiZGMxNjdkOGNlNDFmZTA1Y2EiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 5191168,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "NKf-hf5MjnuCLgJMcAb07Yy7SGkLHwXZ-f8W_JNlUd3sAres1L8NzzFEnmcVb-HHCOVchUb88EoHtVDgNJ1iBw",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-27T18:40:58.172Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "Caquetá is currently receiving less than 40% of its normal electrical power supply, according to Governor Luis Francisco Ruiz.",
      "source": "Blu Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "On 26 November 2026, Caquetá Governor Luis Francisco Ruiz stated that the department is experiencing an energy emergency with up to 20 hours daily without electricity across its 16 municipalities.",
      "source": "Blu Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "Governor Luis Francisco Ruiz confirmed on 2026-11-26 that Caquetá is experiencing severe energy shortages due to attacks on its electrical infrastructure.",
      "source": "KienyKe",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "On 27 November 2026, southern Colombia suffered attacks on electrical infrastructure causing widespread power outages.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "Regional governors stated full repairs to the damaged electrical system will take several days.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "Luis Francisco Ruiz confirmed power was restored to all 16 municipalities of Caquetá on 26 November 2026 following three days of blackouts.",
      "source": "La FM",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.lafm.com.co/orden-publico/caqueta-sufre-tres-dias-de-apagon-gobernador-advierte-otro-ataque-dejarlo-sin-electricidad-418469",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "Governor Luis Francisco Ruiz attributed the power infrastructure attacks to FARC dissident armed groups operating in the region.",
      "source": "Blu Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 8,
      "statement": "Governor Ruiz attributed the attacks to armed groups, specifically the FARC dissidents, who are pressuring the government to halt military operations against them.",
      "source": "KienyKe",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 9,
      "statement": "Repairs to damaged power transmission towers in Huila are expected to take between 4 and 6 additional days to complete.",
      "source": "Blu Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.bluradio.com/nacion/caqueta-vive-una-emergencia-energetica-por-atentados-hay-municipios-con-20-horas-diarias-sin-luz-pr30",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 10,
      "statement": "Caquetá receives less than 40% of the energy it needs, leading to prolonged power outages of up to 20 hours daily in some municipalities.",
      "source": "KienyKe",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 11,
      "statement": "The attacks on the electrical infrastructure have caused significant economic losses, particularly in the agricultural and commercial sectors.",
      "source": "KienyKe",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.kienyke.com/regiones/caqueta-completa-20-horas-diarias-sin-energia-por-atentados",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 12,
      "statement": "Partial, gradual restoration of electrical service had begun at the time of reporting.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/gobernadores-del-sur-advierten-que-reparacion-en-sistema-electrico-tardara-varios-dias-tras-atentado/",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}