{
  "story_id": "ae4523acc0f636ff1b0d767603ad14fa",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-19T01:18:45.000Z",
  "content_hash": "532c122ef9ba518351670f028a2d94150ed5ccfee2f2501247d3b14dd6d150c4",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Mitsubishi Electric selects PLD Space MIURA 5 for demo satellite launch",
    "dek": "Mitsubishi Electric contracts PLD Space to launch a demo satellite aboard MIURA 5.",
    "prose": "PLD Space announced on 18 November that it signed a launch contract with Mitsubishi Electric for a small satellite mission. [^1]\n\nThe contracted satellite will launch aboard the second test flight of PLD Space's MIURA 5 rocket. [^2] No specific launch date has been set for the demo mission; timing depends on the MIURA 5 inaugural flight outcome. [^3] PLD Space delayed the MIURA 5 inaugural flight from late 2026 to the first half of 2027 in a 19 October update. [^4]\n\nThe demonstration satellite is part of Mitsubishi Electric's planned satellite mega-constellation program. [^5]",
    "cited": "[{\"statement\":\"PLD Space announced on 18 November that it signed a launch contract with Mitsubishi Electric for a small satellite mission.\",\"source\":\"European Spaceflight\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T07:25:17.000Z\",\"publisher_count\":1,\"sources\":[\"European Spaceflight\"],\"url\":\"https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/\"},{\"statement\":\"The contracted satellite will launch aboard the second test flight of PLD Space's MIURA 5 rocket.\",\"source\":\"European Spaceflight\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T07:25:17.000Z\",\"publisher_count\":1,\"sources\":[\"European Spaceflight\"],\"url\":\"https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/\"},{\"statement\":\"No specific launch date has been set for the demo mission; timing depends on the MIURA 5 inaugural flight outcome.\",\"source\":\"European Spaceflight\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T07:25:17.000Z\",\"publisher_count\":1,\"sources\":[\"European Spaceflight\"],\"url\":\"https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/\"},{\"statement\":\"PLD Space delayed the MIURA 5 inaugural flight from late 2026 to the first half of 2027 in a 19 October update.\",\"source\":\"European Spaceflight\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-18T07:25:17.000Z\",\"publisher_count\":1,\"sources\":[\"European Spaceflight\"],\"url\":\"https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/\"},{\"statement\":\"The demonstration satellite is part of Mitsubishi Electric's planned satellite mega-constellation program.\",\"source\":\"sorae 宇宙へのポータルサイト\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-19T01:18:45.000Z\",\"publisher_count\":1,\"sources\":[\"sorae 宇宙へのポータルサイト\"],\"url\":\"https://sorae.info/space/20261119-pld-space-mitsubishi-electric.html\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "4e37ccdc50c2d21ce7ed11fefc8401414ae3c6f6ec6df4d72252da3c4139d8d9",
    "cursor_from": "ingest:raw_newsroomfloor.stories:4e37ccdc50c2d21c",
    "cursor_to": "ingest:raw_newsroomfloor.stories:4e37ccdc50c2d21c",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "Dz7XmvlCppngubsnTkfDsQHDUsjjwzriMwO3_eNprqbGVOslY7Y_bIqfxDxCEF9XXL54OQJUQpIX3UarP14iDw",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "55c6d71c8909a2df1cee2576ff7739eb",
      "thread_id": "3643fd28ec765b98c98af9332892bb1f",
      "thread_label": "MIURA 5",
      "novelty": "UPDATE",
      "content_hash": "b56e62ecf011be6e2239edc0fd13ff0c006ae1c896484ff4d0a25ca166a94573",
      "compose": 3,
      "last_published_at": "2026-11-19T01:18:45.000Z",
      "read_receipt": {
        "slice_hash": "bd4c78e9ab0516b5223c69ff0ce2ca8e4682469c7bd24248305cae8dceedd50a",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMTlUMDA6MDA6MDAuMDAwWiIsImlkIjoiN2I5MjNkNzBlYWZmOGIwOGQyNGYxZGY4MjQ0NzZiNjYiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMTlUMDc6MzY6MDMuMDAwMDAwWiIsImlkIjoiZjhiY2I4MDljMmI3NTdjNWU5M2I0ODZhYzIyOTVmYTIiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 3577351,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "EYekDUExucThfFNwfCUL16IP4hQ0Yi05n0OdBcHj6gJq3Dbrv0lZdaZ1CU3GVrqsZHT-Kvr5VkuY9K9jrdSPBA",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-19T22:03:05.419Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "PLD Space announced on 18 November that it signed a launch contract with Mitsubishi Electric for a small satellite mission.",
      "source": "European Spaceflight",
      "instrument": "News",
      "claim_key": null,
      "url": "https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "The contracted satellite will launch aboard the second test flight of PLD Space's MIURA 5 rocket.",
      "source": "European Spaceflight",
      "instrument": "News",
      "claim_key": null,
      "url": "https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "No specific launch date has been set for the demo mission; timing depends on the MIURA 5 inaugural flight outcome.",
      "source": "European Spaceflight",
      "instrument": "News",
      "claim_key": null,
      "url": "https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "PLD Space delayed the MIURA 5 inaugural flight from late 2026 to the first half of 2027 in a 19 October update.",
      "source": "European Spaceflight",
      "instrument": "News",
      "claim_key": null,
      "url": "https://europeanspaceflight.com/pld-space-investor-selects-miura-5-to-launch-demo-mission/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "The demonstration satellite is part of Mitsubishi Electric's planned satellite mega-constellation program.",
      "source": "sorae 宇宙へのポータルサイト",
      "instrument": "News",
      "claim_key": null,
      "url": "https://sorae.info/space/20261119-pld-space-mitsubishi-electric.html",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}