{
  "story_id": "cc6080b338de398c22c77c066a2dd96c",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-25T17:32:21.000Z",
  "content_hash": "c85bc81f90de9ddc2acb3ef67f2659bab10c30dcd45a91d53ea00d4c90f77101",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "New Sajonia Bridge Opens in Antioquia to Boost Airport Traffic",
    "dek": "The new Sajonia Bridge in Antioquia is now operational to improve traffic to the José María Córdova airport.",
    "prose": "The second phase of the Túnel de Oriente project has a 30% overall progress and includes 13 active work fronts along a 15-kilometer route. [^1][^2]\n\nThe Sajonia 2 bridge is the first completed infrastructure milestone for the Oriente Tunnel second construction phase. [^3] The bridge is 355 meters long and was constructed with 4,880 cubic meters of concrete and 931 tons of high-strength steel. [^4] The governor of Rionegro, Andrés Julián Rendón, said on November 23, 2026 that the bridge improves mobility in a high-traffic area, especially during peak travel times. [^5]\n\nAntioquia governor Andrés Julián stated he expects the full second Oriente Tunnel to open before his administration ends. [^6] The full Oriente Tunnel second phase project has a total budget over 1.3 trillion pesos and has reached 30% overall completion. [^7]",
    "cited": "[{\"statement\":\"The new Sajonia Bridge in Antioquia, part of the second phase of the Túnel de Oriente project, opened on November 22, 2026.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464\"},{\"statement\":\"The second phase of the Túnel de Oriente project has a 30% overall progress and includes 13 active work fronts along a 15-kilometer route.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464\"},{\"statement\":\"The Sajonia 2 bridge is the first completed infrastructure milestone for the Oriente Tunnel second construction phase.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/\"},{\"statement\":\"The bridge is 355 meters long and was constructed with 4,880 cubic meters of concrete and 931 tons of high-strength steel.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464\"},{\"statement\":\"The governor of Rionegro, Andrés Julián Rendón, said on November 23, 2026 that the bridge improves mobility in a high-traffic area, especially during peak travel times.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464\"},{\"statement\":\"Antioquia governor Andrés Julián stated he expects the full second Oriente Tunnel to open before his administration ends.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/\"},{\"statement\":\"The full Oriente Tunnel second phase project has a total budget over 1.3 trillion pesos and has reached 30% overall completion.\",\"source\":\"El Espectador\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "62fa353c5e139b57f11ead8390472cae208c06f450b55aeff9ba81b319e14564",
    "cursor_from": "ingest:raw_newsroomfloor.stories:62fa353c5e139b57",
    "cursor_to": "ingest:raw_newsroomfloor.stories:62fa353c5e139b57",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "71N1F2LClZTFHJz14Hy7CQ3dOkMoKmv46QjCPPZDwN5SUwpG2FcX7qU9IeA_voUXIazZ9vXv4CDru-gnq9iuAg",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "e1c00612ac419b8625d7426868b85d4d",
      "thread_id": "af84c2526495cf0c4a9e5a7d46dfe6d2",
      "thread_label": "Sajonia 2",
      "novelty": "UPDATE",
      "content_hash": "01033273ae741757fce5eec09c5b206f550ee3948761b7993d714ce0bb577e2a",
      "compose": 3,
      "last_published_at": "2026-11-25T17:32:21.000Z",
      "read_receipt": {
        "slice_hash": "053580b870545bff0f08d16301350a0685325a69dd4fb58d9f46346c814db5e5",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjVUMTc6MDU6NDUuMDAwWiIsImlkIjoiNzIxNTE3YTFmMGIxMjA2OWM1YWFlNGUyMjc3OTNlYjAiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjVUMTc6NTA6MTEuMDAwMDAwWiIsImlkIjoiN2ZhYjE5NzJjZmFmNzZiMzEzZjhlZWMzZTkzMzZlMGUiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 53,
        "window_days": 3,
        "bytes_scanned": 5531959,
        "credits": 4.24,
        "price_per_100_rows": 8,
        "sig": "oMTw9K_QZy4BFY03poynG5mvh1U3Dfgt6ZHGx1TOkVCWaHqLJgwGR8ZaxfmteQb2KATB8fVR-Kzv5BhIqDOLCg",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-25T18:58:10.344Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "The new Sajonia Bridge in Antioquia, part of the second phase of the Túnel de Oriente project, opened on November 22, 2026.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "The second phase of the Túnel de Oriente project has a 30% overall progress and includes 13 active work fronts along a 15-kilometer route.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "The Sajonia 2 bridge is the first completed infrastructure milestone for the Oriente Tunnel second construction phase.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "The bridge is 355 meters long and was constructed with 4,880 cubic meters of concrete and 931 tons of high-strength steel.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "The governor of Rionegro, Andrés Julián Rendón, said on November 23, 2026 that the bridge improves mobility in a high-traffic area, especially during peak travel times.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/medellin/tunel-de-oriente-estrena-el-puente-de-sajonia-y-busca-reforzar-el-transito-cuales-son-los-beneficios-de-movilidad-hacia-el-aeropuerto-de-rionegro-3603464",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "Antioquia governor Andrés Julián stated he expects the full second Oriente Tunnel to open before his administration ends.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "The full Oriente Tunnel second phase project has a total budget over 1.3 trillion pesos and has reached 30% overall completion.",
      "source": "El Espectador",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elespectador.com/especiales/gobernacion-de-antioquia-y-concesion-habilitan-el-puente-sajonia-2-del-tunel-de-oriente/",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}