{
  "story_id": "d0edb8299292a0d05c4dadac7524d471",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-27T12:54:36.000Z",
  "content_hash": "151076aa451c21c2285294c5e2cee21efe9595a07435baf8c3fc859341043b20",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Cartagena expands Bocagrande pedestrian walkway by 5 meters",
    "dek": "Cartagena begins work to expand Bocagrande's pedestrian walkway by 5 meters as part of a $168 billion project.",
    "prose": "Cartagena began work on 2026-11-26 to expand the pedestrian walkway in Bocagrande by 5 meters as part of the Cuatro en Uno project. [^1][^2]\n\nThe expansion will extend the walkway by 10,000 square meters and include underground infrastructure for water management. [^3] The project, led by Mayor Dumek Turbay, includes reducing flooding, modernizing infrastructure, and recovering public spaces. [^4] Colombian maritime authority DIMAR granted the required construction permit for this coastal worksite. [^5]\n\nThe Cuatro en Uno project has a total allocated budget of $168 billion. [^6] The pedestrian walkway will be widened by 5 metres along 2 kilometres, creating 10,000 square metres of new public space. [^7]",
    "cited": "[{\"statement\":\"Cartagena began work on 2026-11-26 to expand the pedestrian walkway in Bocagrande by 5 meters as part of the Cuatro en Uno project.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T01:01:15.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/\"},{\"statement\":\"On 27 November 2026, piling works commenced for the Bocagrande and Castillogrande bay pedestrian walkway expansion in Cartagena.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T12:54:36.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/\"},{\"statement\":\"The expansion will extend the walkway by 10,000 square meters and include underground infrastructure for water management.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T01:01:15.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/\"},{\"statement\":\"The project, led by Mayor Dumek Turbay, includes reducing flooding, modernizing infrastructure, and recovering public spaces.\",\"source\":\"El Universal\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T01:01:15.000Z\",\"publisher_count\":1,\"sources\":[\"El Universal\"],\"url\":\"https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/\"},{\"statement\":\"Colombian maritime authority DIMAR granted the required construction permit for this coastal worksite.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T12:54:36.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/\"},{\"statement\":\"The Cuatro en Uno project has a total allocated budget of $168 billion.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T12:54:36.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/\"},{\"statement\":\"The pedestrian walkway will be widened by 5 metres along 2 kilometres, creating 10,000 square metres of new public space.\",\"source\":\"Caracol Radio\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T12:54:36.000Z\",\"publisher_count\":1,\"sources\":[\"Caracol Radio\"],\"url\":\"https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "cb0eec64e858e2b19e94eb3df2af908f500c4f297832034632bba2afcb94e23b",
    "cursor_from": "ingest:raw_newsroomfloor.stories:cb0eec64e858e2b1",
    "cursor_to": "ingest:raw_newsroomfloor.stories:cb0eec64e858e2b1",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "tCCrO4muUJe8uEHRFTtj6XBhkAlSouDM5Degzn3zYgml6T-5Cm1NDh8p6dxnDTigzWJBZr2qJTURw4B6XW8HCQ",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "1c95475c506e03883a71c4c979648315",
      "thread_id": "44580a47e7002a8d67e82e4f4e843cf6",
      "thread_label": "Cuatro en Uno",
      "novelty": "UPDATE",
      "content_hash": "32533ce91993e91a0efbf8549b79c37db14eb588cafe4ba5670443daf745ca45",
      "compose": 3,
      "last_published_at": "2026-11-27T12:54:36.000Z",
      "read_receipt": {
        "slice_hash": "737f0e3d2c91ddc82d9efdee6bfb607b6ce79f52e8986f797833d53d0122cf58",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjdUMTI6NTQ6MDcuMDAwWiIsImlkIjoiM2ZhMzE1MWQwZjFhNjIxYWM2MjNmYmNiN2UzNzk3ODQiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjdUMTQ6MzA6NTAuMDAwMDAwWiIsImlkIjoiM2RhZWRhMjEzODAzODBiZGMxNjdkOGNlNDFmZTA1Y2EiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 100,
        "window_days": 3,
        "bytes_scanned": 5191168,
        "credits": 8,
        "price_per_100_rows": 8,
        "sig": "NKf-hf5MjnuCLgJMcAb07Yy7SGkLHwXZ-f8W_JNlUd3sAres1L8NzzFEnmcVb-HHCOVchUb88EoHtVDgNJ1iBw",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-27T18:40:50.099Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "Cartagena began work on 2026-11-26 to expand the pedestrian walkway in Bocagrande by 5 meters as part of the Cuatro en Uno project.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "On 27 November 2026, piling works commenced for the Bocagrande and Castillogrande bay pedestrian walkway expansion in Cartagena.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "The expansion will extend the walkway by 10,000 square meters and include underground infrastructure for water management.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "The project, led by Mayor Dumek Turbay, includes reducing flooding, modernizing infrastructure, and recovering public spaces.",
      "source": "El Universal",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eluniversal.com.co/cartagena/2026/11/26/el-paseo-peatonal-de-bocagrande-crecera-cinco-metros-comenzaron-los-trabajos/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "Colombian maritime authority DIMAR granted the required construction permit for this coastal worksite.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "The Cuatro en Uno project has a total allocated budget of $168 billion.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "The pedestrian walkway will be widened by 5 metres along 2 kilometres, creating 10,000 square metres of new public space.",
      "source": "Caracol Radio",
      "instrument": "News",
      "claim_key": null,
      "url": "https://caracol.com.co/2026/11/27/inicia-hincado-de-pilotes-para-ampliar-el-paseo-peatonal-de-la-bahia-de-bocagrande-y-castillogrande/",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}