{
  "story_id": "e970cc578e515d1ff8d20f70ae66ea7b",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-21T11:20:04.000Z",
  "content_hash": "c9ad58fdaa04cddad7b805c21b5c220204df3ab4e7929e3644870028513108d1",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Moscow-Saint Petersburg high-speed rail enters full construction phase",
    "dek": "Russian Deputy PM Andrey Nikitin announced full construction start for Moscow-Saint Petersburg high-speed rail.",
    "prose": "Russian Deputy Prime Minister Andrey Nikitin stated at the Transport Russia forum that construction of the Moscow-Saint Petersburg high-speed railway has entered full scale phase. [^1][^2]\n\nThe Moscow-Saint Petersburg high-speed railway is scheduled to begin operation in 2028, with a total travel time of 2 hours 15 minutes between the cities. [^3] Russian Deputy Prime Minister Andrey Nikitin told TASS on November 21 that train traffic across the Crimean Bridge has been fully restored. [^4] Andrey Nikitin confirmed the first three train sets for the Moscow-Saint Petersburg high-speed line are currently being assembled. [^5]\n\nAndrey Nikitin stated that trains operating on the Crimean Bridge route are running as scheduled. [^6] Ukrainian military forces conducted strikes against the Crimean Bridge on November 16, 17 and 18. [^7] Ukrainian strikes on the Crimean Bridge occurred during the APEC summit period. [^8]",
    "cited": "[{\"statement\":\"Russian Deputy Prime Minister Andrey Nikitin stated at the Transport Russia forum that construction of the Moscow-Saint Petersburg high-speed railway has entered full scale phase.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/\"},{\"statement\":\"Andrey Nikitin stated the Moscow-Saint Petersburg high-speed railway project employs over 32000 personnel, 11000 units of machinery, and involves 150 cooperating enterprises.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/\"},{\"statement\":\"The Moscow-Saint Petersburg high-speed railway is scheduled to begin operation in 2028, with a total travel time of 2 hours 15 minutes between the cities.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/\"},{\"statement\":\"Russian Deputy Prime Minister Andrey Nikitin told TASS on November 21 that train traffic across the Crimean Bridge has been fully restored.\",\"source\":\"TASS\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://tass.com/society/2222879\"},{\"statement\":\"Andrey Nikitin confirmed the first three train sets for the Moscow-Saint Petersburg high-speed line are currently being assembled.\",\"source\":\"Lenta.ru\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/\"},{\"statement\":\"Andrey Nikitin stated that trains operating on the Crimean Bridge route are running as scheduled.\",\"source\":\"TASS\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://tass.com/society/2222879\"},{\"statement\":\"Ukrainian military forces conducted strikes against the Crimean Bridge on November 16, 17 and 18.\",\"source\":\"TASS\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://tass.com/society/2222879\"},{\"statement\":\"Ukrainian strikes on the Crimean Bridge occurred during the APEC summit period.\",\"source\":\"TASS\",\"instrument\":\"News\",\"claim_key\":null,\"url\":\"https://tass.com/society/2222879\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "ce70f0d6a5bdf1cc650e3b1ed7c54b260562a3ef67d6b58a687fee33dcf87686",
    "cursor_from": "ingest:raw_newsroomfloor.stories:ce70f0d6a5bdf1cc",
    "cursor_to": "ingest:raw_newsroomfloor.stories:ce70f0d6a5bdf1cc",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "1but6uLFhoSe264tvQDfAFait64dH1Yy5JBPpWrOLK1zA05x6P0jk-uco_cx7P-Yjl5eaozvpVXXEiIY-xdeCg",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "4efdb3583e3fdc133797e6c78d1e9f93",
      "thread_id": "429565fbe2df176b02f86e13073ec36f",
      "thread_label": "Andrey Nikitin",
      "novelty": "UPDATE",
      "content_hash": "0cc4eb10e3799bfe8458c438e1828febc7fba655ccd033c60e20a81cd461e257",
      "compose": 3,
      "last_published_at": "2026-11-21T11:20:04.000Z",
      "read_receipt": {
        "slice_hash": "a10adeed3ca71770d9f5fdebe510c48162523749db946f27339bc1fb15b6425d",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjFUMTA6NTU6NTEuMDAwWiIsImlkIjoiNWYzNGY5YTExYWQ3OTVmYmM4ZDNjYTA2N2EzMmE1OTMiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjFUMTE6NDg6NTYuMDAwMDAwWiIsImlkIjoiMDU4NzhmOTMwMzljNDI1ZmEwNjExNzI4OWY5ZDA2MmEiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 12,
        "window_days": 3,
        "bytes_scanned": 2450971,
        "credits": 0.96,
        "price_per_100_rows": 8,
        "sig": "i9Bg8GF6fUIOHnRchSN31yeZRxizn3DNvpQDAgIf5hUyTOW-gEH7YxrzjxCyI1KnU0-p49EVkpjVDqsLVWc6Bg",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-21T12:42:20.204Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "Russian Deputy Prime Minister Andrey Nikitin stated at the Transport Russia forum that construction of the Moscow-Saint Petersburg high-speed railway has entered full scale phase.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "url": "https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "Andrey Nikitin stated the Moscow-Saint Petersburg high-speed railway project employs over 32000 personnel, 11000 units of machinery, and involves 150 cooperating enterprises.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "url": "https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "The Moscow-Saint Petersburg high-speed railway is scheduled to begin operation in 2028, with a total travel time of 2 hours 15 minutes between the cities.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "url": "https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "Russian Deputy Prime Minister Andrey Nikitin told TASS on November 21 that train traffic across the Crimean Bridge has been fully restored.",
      "source": "TASS",
      "instrument": "News",
      "claim_key": null,
      "url": "https://tass.com/society/2222879",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "Andrey Nikitin confirmed the first three train sets for the Moscow-Saint Petersburg high-speed line are currently being assembled.",
      "source": "Lenta.ru",
      "instrument": "News",
      "claim_key": null,
      "url": "https://lenta.ru/news/2026/11/19/stroitelstvo-vsm-moskva-peterburg-pereshlo-v-polnomasshtabnuyu-fazu/",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "Andrey Nikitin stated that trains operating on the Crimean Bridge route are running as scheduled.",
      "source": "TASS",
      "instrument": "News",
      "claim_key": null,
      "url": "https://tass.com/society/2222879",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "Ukrainian military forces conducted strikes against the Crimean Bridge on November 16, 17 and 18.",
      "source": "TASS",
      "instrument": "News",
      "claim_key": null,
      "url": "https://tass.com/society/2222879",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 8,
      "statement": "Ukrainian strikes on the Crimean Bridge occurred during the APEC summit period.",
      "source": "TASS",
      "instrument": "News",
      "claim_key": null,
      "url": "https://tass.com/society/2222879",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}