{
  "story_id": "fafa92574d7f209ca1cd30074b16577a",
  "desk": "drm3",
  "revision": 1,
  "published_at": "2026-11-27T23:39:59.000Z",
  "content_hash": "39c0f9d3a5ed1a873f32f8b3261fcee8f4921304122055dff2dbd76b4491a18a",
  "hash_basis": "sha256 over `headline\\ndek\\nprose`, plus `\\n` + the canonical citations JSON when any source is placed, plus `\\n#blog` for blogs",
  "basis": {
    "headline": "Energy restored in Colombia after terrorist attack on power towers",
    "dek": "Power service fully restored in Nariño, Cauca, Putumayo, Huila, and Caquetá after 72-hour outage",
    "prose": "On 2026-11-27, electricity service was fully restored to Nariño, Cauca, Putumayo, Huila, and Caquetá after a 72-hour outage caused by a terrorist attack on two power towers in rural Taminango. [^1][^2][^3]\n\nMinister of Mines and Energy, María Nohemi Arboleda, stated that the restoration was achieved through joint efforts and emphasized the state's commitment to repairing and protecting the infrastructure. [^4] Specialized units of the Army and Police are verifying and securing the area around the damaged tower in Taminango to protect technical teams working to install emergency towers. [^5] The Ministry of Mines and Energy expressed gratitude to the Fuerza Pública, XM, energy companies, and technical teams for their efforts in restoring power. [^6]\n\nAuthorities warn that the emergency is not over, as not all circuits affected by the November 24 attacks have been fully recovered. [^7] Enlaza, a subsidiary of Grupo Energía Bogotá, reconnected Nariño to the National Transmission System (STN) and interlinked Nariño and Cauca via the Regional Transmission System (STR). [^8]",
    "cited": "[{\"statement\":\"On 2026-11-27, electricity service was fully restored to Nariño, Cauca, Putumayo, Huila, and Caquetá after a 72-hour outage caused by a terrorist attack on two power towers in rural Taminango.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T22:22:55.000Z\",\"publisher_count\":1,\"sources\":[\"El Tiempo\"],\"url\":\"https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029\"},{\"statement\":\"An attack on two energy towers in rural Nariño caused a three-day power outage in Colombia's southwest on November 24, 2026.\",\"source\":\"El Colombiano\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T23:39:59.000Z\",\"publisher_count\":1,\"sources\":[\"El Colombiano\"],\"url\":\"https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901\"},{\"statement\":\"On November 27, 2026, Centrales Eléctricas de Nariño (Cedenar) announced that power had been fully restored to Nariño, Cauca, Putumayo, Caquetá, and southern Huila.\",\"source\":\"El Colombiano\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T23:39:59.000Z\",\"publisher_count\":1,\"sources\":[\"El Colombiano\"],\"url\":\"https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901\"},{\"statement\":\"Minister of Mines and Energy, María Nohemi Arboleda, stated that the restoration was achieved through joint efforts and emphasized the state's commitment to repairing and protecting the infrastructure.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T22:22:55.000Z\",\"publisher_count\":1,\"sources\":[\"El Tiempo\"],\"url\":\"https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029\"},{\"statement\":\"Specialized units of the Army and Police are verifying and securing the area around the damaged tower in Taminango to protect technical teams working to install emergency towers.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T22:22:55.000Z\",\"publisher_count\":1,\"sources\":[\"El Tiempo\"],\"url\":\"https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029\"},{\"statement\":\"The Ministry of Mines and Energy expressed gratitude to the Fuerza Pública, XM, energy companies, and technical teams for their efforts in restoring power.\",\"source\":\"El Tiempo\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T22:22:55.000Z\",\"publisher_count\":1,\"sources\":[\"El Tiempo\"],\"url\":\"https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029\"},{\"statement\":\"Authorities warn that the emergency is not over, as not all circuits affected by the November 24 attacks have been fully recovered.\",\"source\":\"El Colombiano\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T23:39:59.000Z\",\"publisher_count\":1,\"sources\":[\"El Colombiano\"],\"url\":\"https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901\"},{\"statement\":\"Enlaza, a subsidiary of Grupo Energía Bogotá, reconnected Nariño to the National Transmission System (STN) and interlinked Nariño and Cauca via the Regional Transmission System (STR).\",\"source\":\"El Colombiano\",\"instrument\":\"News\",\"claim_key\":null,\"published_at\":\"2026-11-27T23:39:59.000Z\",\"publisher_count\":1,\"sources\":[\"El Colombiano\"],\"url\":\"https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901\"}]",
    "kind": "news"
  },
  "receipt_verify": "Ed25519 over the dot-joined string `slice_hash.cursor_from.cursor_to.view.view_version.row_count`; public_key and sig are base64url of the raw 32-byte key / 64-byte signature",
  "receipt": {
    "slice_hash": "f16d2bd8947253127006242344269e1468fc88efd24ec6e1ef21fcf7ea34cc8f",
    "cursor_from": "ingest:raw_newsroomfloor.stories:f16d2bd894725312",
    "cursor_to": "ingest:raw_newsroomfloor.stories:f16d2bd894725312",
    "view": "ingest:raw_newsroomfloor.stories",
    "view_version": "1",
    "row_count": 1,
    "hash_basis": "sha256 over the JSON array of {insertId, json} rows as received (normalized wire shape), computed before the BigQuery forward",
    "credits": 0.01,
    "price_per_100_rows_written": 1,
    "sig": "VN8x49UVYOD5N3MsTxENyjVj6rkgfOJeAzsQE3tJs5AbtcdRzItm9LrL5vvT0UbBekuCwBIiA36Ai-g2ysu6Cw",
    "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
    "signer_path": "lakehouse/data-extract/v1",
    "alg": "Ed25519",
    "signed": true
  },
  "receipt_note": "the ingest door's signed receipt for this revision, verbatim as the door returned it",
  "generation_chain": {
    "wire": {
      "stream": "fountain_news",
      "story_id": "3814cc528dc9053146b736a54aee135c",
      "thread_id": "24f8aa0ca3a496f8211dd383f83b8c3b",
      "thread_label": "Sistema de Transmisión Regional",
      "novelty": "UPDATE",
      "content_hash": "d51032ca2c8d2d930a53a452afb7a5206107e8fd1ab47c9f94a04678d7346d77",
      "compose": 3,
      "last_published_at": "2026-11-27T23:39:59.000Z",
      "read_receipt": {
        "slice_hash": "a6cf30e1fa664fd8522e6e5c774a09f725632998a1a81717336352119cd71805",
        "cursor_from": "eyJ0cyI6IjIwMjYtMTEtMjdUMjI6NTM6MTIuMDAwWiIsImlkIjoiNmZhMmNmODRlZDM2NGVlZjEwNzY1YWJiNGUyMDVjMGIiLCJ2IjoiMSJ9",
        "cursor_to": "eyJ0cyI6IjIwMjYtMTEtMjdUMjM6NTE6MTcuMDAwMDAwWiIsImlkIjoiYTQyOWNlN2ZhODc5NDdjZTI5NDMxNzNiMWRmNDExOGEiLCJ2IjoiMSJ9",
        "view": "v_fountain_news",
        "view_version": "1",
        "row_count": 38,
        "window_days": 3,
        "bytes_scanned": 4475787,
        "credits": 3.04,
        "price_per_100_rows": 8,
        "sig": "6VMFkAbgejCxu6FDLRB9a8D9w9ERJYx3QXzQ_JWKZ4mDym3LQ1oOyyoBbtwrdJfWeoq6UwbaEFkJc7YXWsE0AA",
        "public_key": "bMUigy8O0jOnBxQ4Sc-5lwhIZ8LQVAhxMbR7qESVuUE",
        "signer_path": "lakehouse/data-extract/v1",
        "alg": "Ed25519",
        "signed": true
      },
      "landing": "air"
    },
    "written_at": "2026-11-28T01:04:20.902Z"
  },
  "cited_facts": [
    {
      "n": 1,
      "statement": "On 2026-11-27, electricity service was fully restored to Nariño, Cauca, Putumayo, Huila, and Caquetá after a 72-hour outage caused by a terrorist attack on two power towers in rural Taminango.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 2,
      "statement": "An attack on two energy towers in rural Nariño caused a three-day power outage in Colombia's southwest on November 24, 2026.",
      "source": "El Colombiano",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 3,
      "statement": "On November 27, 2026, Centrales Eléctricas de Nariño (Cedenar) announced that power had been fully restored to Nariño, Cauca, Putumayo, Caquetá, and southern Huila.",
      "source": "El Colombiano",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 4,
      "statement": "Minister of Mines and Energy, María Nohemi Arboleda, stated that the restoration was achieved through joint efforts and emphasized the state's commitment to repairing and protecting the infrastructure.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 5,
      "statement": "Specialized units of the Army and Police are verifying and securing the area around the damaged tower in Taminango to protect technical teams working to install emergency towers.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 6,
      "statement": "The Ministry of Mines and Energy expressed gratitude to the Fuerza Pública, XM, energy companies, and technical teams for their efforts in restoring power.",
      "source": "El Tiempo",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.eltiempo.com/colombia/cali/restablecen-al-100-el-servicio-de-energia-en-narino-caqueta-putumayo-y-sur-del-huila-y-del-cauca-tras-atentado-en-zona-rural-de-taminango-3605029",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 7,
      "statement": "Authorities warn that the emergency is not over, as not all circuits affected by the November 24 attacks have been fully recovered.",
      "source": "El Colombiano",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901",
      "occurred_at": null,
      "published_at": null
    },
    {
      "n": 8,
      "statement": "Enlaza, a subsidiary of Grupo Energía Bogotá, reconnected Nariño to the National Transmission System (STN) and interlinked Nariño and Cauca via the Regional Transmission System (STR).",
      "source": "El Colombiano",
      "instrument": "News",
      "claim_key": null,
      "url": "https://www.elcolombiano.com/colombia/vuelve-totalidad-servicio-energia-narino-cauca-putumayo-caqueta-huila-atentado-red-electrica-BG44179901",
      "occurred_at": null,
      "published_at": null
    }
  ],
  "note": "A signature proves who filed this and that it has not changed since. It never makes a claim true. The dates on cited_facts (occurred_at, published_at) are the forge's, joined at read time; they are not part of the signed basis above."
}